First Bus
Design and installation of over 2 MW of solar PV at more than 20 First Bus sites across the United Kingdom.
As intermittency of renewables increases and demand for electricity supply becomes further constrained due to heat decarbonisation, electric vehicle charging increases demand and variable onsite generation from renewables creates volatility, CorEnergy can help ensure capacity is managed and onsite generation is fully utilised through installing commercial scale energy battery storage.
With high performance battery storage solutions ranging from 200kWh to 50MW, CorEnergy will design and install the optimised solution for your site, with technology designed for internal or external mounting in climate controlled, IP65 housings.
The in-house engineering team will design the most appropriate solution to help ensure onsite generation and peak load is efficiently managed, financially modelled and lifetime reliable.
Please see the below Energy Storage Solution brochures: